Browse through some of our featured projects below to review the scope of our projects, which include highway and road construction, excavation for utilities, public municipality construction projects and private company construction and demolition projects on Cape Cod and beyond. Contact us to discuss your project needs!
Heavy Highway, Road Construction & Utilities
City of Hingham Bulow Road Water Main Replacement
Date: 12/1/2020
Value: $600,000
Contact: Weir River Water System OPM City of Hingham
Engineer: Environmental Partners
Description: Furnish and install 2,000 LF of 8” ductile iron water pipe with all valves and hydrants. Furnish and install 900 LF of 6” ductile iron water pipe with all valves and hydrants.
Value: $600,000
Contact: Weir River Water System OPM City of Hingham
Engineer: Environmental Partners
Description: Furnish and install 2,000 LF of 8” ductile iron water pipe with all valves and hydrants. Furnish and install 900 LF of 6” ductile iron water pipe with all valves and hydrants.
City of Easton Pond Street Water Main Replacement
Date: 9/1/2020
Value: $550,000
Engineer: Tight & Bond
Description: Furnish and install 1,800 LF of 8” ductile iron water pipe with valves and hydrants. Installation of temporary water for the duration of the project. Install 12” ductile iron water pipe for MA DOT bridge crossing. Install 8” HDPE pipe by directional drill under the existing stream with temporary asphalt.
Value: $550,000
Engineer: Tight & Bond
Description: Furnish and install 1,800 LF of 8” ductile iron water pipe with valves and hydrants. Installation of temporary water for the duration of the project. Install 12” ductile iron water pipe for MA DOT bridge crossing. Install 8” HDPE pipe by directional drill under the existing stream with temporary asphalt.
Town of Eastham New Watermain Contracts 13, 14, 15, 16, 18, 19, 20, 21, 22 & 23.
Date: 2/1/2019 – On-going
Value: $11,000,000
Engineer: Environmental Partners
Description: Furnish and install 375,000 LF of new 6”, 8” and 12″ ductile iron water pipe for the new municipal water system. Installation of 2,000 residential services. Temporary asphalt trench paving. Full-width milling and overlay asphalt paving. Multiple 6” and 8” HDPE directional drills.
Value: $11,000,000
Engineer: Environmental Partners
Description: Furnish and install 375,000 LF of new 6”, 8” and 12″ ductile iron water pipe for the new municipal water system. Installation of 2,000 residential services. Temporary asphalt trench paving. Full-width milling and overlay asphalt paving. Multiple 6” and 8” HDPE directional drills.
Town of Sandwich Pleasant Wood Drainage
Date: 2019-2020
Value: $199,400
Description: Installation of road drainage, multiple town sites.
Value: $199,400
Description: Installation of road drainage, multiple town sites.
Public Municipalities
Carver Police Station
Date: 2/1/2020
Value: $1,100,000
General Contractor: Tower Construction Corporation
Engineer: OPM Daedalus
Description: Complete site package for new Police station. Clear and stump 4 acres, 6,000 cubic yards of cuts and fills for topography grade. Installation of site grading, drainage, prep for site lighting, and utilities. Install water, sewer, sidewalks, and asphalt paving.
Value: $1,100,000
General Contractor: Tower Construction Corporation
Engineer: OPM Daedalus
Description: Complete site package for new Police station. Clear and stump 4 acres, 6,000 cubic yards of cuts and fills for topography grade. Installation of site grading, drainage, prep for site lighting, and utilities. Install water, sewer, sidewalks, and asphalt paving.
Carver Fire Station
Date: 3/1/2016
Value: $1,300,000
General Contractor: M. O’Contracting Inc.
Contact: OPM Daedalus
Description: Complete site package for new 45,000 SF Fire station. Installation of site grading, drainage with a retention pond. Installation of water, sewer, curbing, prep for site lighting and utilities, sidewalks, and asphalt paving.
Value: $1,300,000
General Contractor: M. O’Contracting Inc.
Contact: OPM Daedalus
Description: Complete site package for new 45,000 SF Fire station. Installation of site grading, drainage with a retention pond. Installation of water, sewer, curbing, prep for site lighting and utilities, sidewalks, and asphalt paving.
Sandwich Public Safety Facility & Fire Station #2
Date: 6/1/19
Value: $1,141,530.90
General Contractor: Boston Building and Bridge
Engineer: GGD
Description: Complete site package for new 38,000 SF Police and Fire station. Installation of site grading, drainage, sewer, water, prep for site lighting and utilities, sidewalks, and asphalt paving.
Value: $1,141,530.90
General Contractor: Boston Building and Bridge
Engineer: GGD
Description: Complete site package for new 38,000 SF Police and Fire station. Installation of site grading, drainage, sewer, water, prep for site lighting and utilities, sidewalks, and asphalt paving.
Chatham Cemetery
Date: 3/1/2018
Value: $650,000
Engineer: JM O’Reilly
Description: Excavate and cut 40,000 cubic yards of material to achieve grade, removal of surplus material. Installation of new road, drainage, water main, final grade with loam and hydroseed.
Value: $650,000
Engineer: JM O’Reilly
Description: Excavate and cut 40,000 cubic yards of material to achieve grade, removal of surplus material. Installation of new road, drainage, water main, final grade with loam and hydroseed.
Hyannis Fire Station
Date: 2018-2020
Value: $1,100,000
General Contractor: CTA Construction Management
Description: Demolition and removal of an existing facility. Complete site package for new 75,000 SF Fire station. Installation of site drainage with a retention pond, sewer connection, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.
Value: $1,100,000
General Contractor: CTA Construction Management
Description: Demolition and removal of an existing facility. Complete site package for new 75,000 SF Fire station. Installation of site drainage with a retention pond, sewer connection, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.
Orleans Police Station
Date: 2017
Value: $890,000
General Contractor: RCA Builders
Description: Demolition and removal of an existing facility. Complete site package for a new Police station. Installation of site drainage, septic, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.
Value: $890,000
General Contractor: RCA Builders
Description: Demolition and removal of an existing facility. Complete site package for a new Police station. Installation of site drainage, septic, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.
Tisbury Fire Station
Date: 2017
Value: $975,000
General Contractor: J.K Scanlan/Dellbrook
Description: Demolition and removal of an existing facility. Complete site package for new 21,000 SF Fire Station. Installation of drainage, water, sewer, prep for utilities and site lighting, curbing, and asphalt paving.
Value: $975,000
General Contractor: J.K Scanlan/Dellbrook
Description: Demolition and removal of an existing facility. Complete site package for new 21,000 SF Fire Station. Installation of drainage, water, sewer, prep for utilities and site lighting, curbing, and asphalt paving.
Brewster Drainage
Date: 2016
Value: $174,000
Contact: Town of Brewster
Description: Fisherman landing. Demolition and removal of an existing parking lot. Reconstruction of a new parking lot. Installation of site drainage, new septic leaching field, curbing, and asphalt paving.
Value: $174,000
Contact: Town of Brewster
Description: Fisherman landing. Demolition and removal of an existing parking lot. Reconstruction of a new parking lot. Installation of site drainage, new septic leaching field, curbing, and asphalt paving.
Oak Bluffs Fire Station
Date: 2015
Value: $600,000
General Contractor: J.K. Scanlan
Description: Demolition and removal of an existing facility. Complete site package for new Fire Station. Installation of site drainage, water, prep for site lighting and utilities, curbing, and asphalt paving.
Value: $600,000
General Contractor: J.K. Scanlan
Description: Demolition and removal of an existing facility. Complete site package for new Fire Station. Installation of site drainage, water, prep for site lighting and utilities, curbing, and asphalt paving.
Barnstable Water
Date: 2014 – 2016
Value: $1,700,000
Description: Furnish and install approximately 12,000 ft of 8” & 12” ductile iron water main pipe at multiple town locations.
Value: $1,700,000
Description: Furnish and install approximately 12,000 ft of 8” & 12” ductile iron water main pipe at multiple town locations.
Town of Barnstable Dredging and Beach Nourishment
Date: 10/1/2018 – 12/20/2020
Value: $900,000
Engineer: Town of Barnstable
Description: Sampson’s Island Phase 2 & Phase 3. Dewatering and spreading 50,000 cubic yards of sand on Island. All equipment delivered by barge and loaded on to beach.
Value: $900,000
Engineer: Town of Barnstable
Description: Sampson’s Island Phase 2 & Phase 3. Dewatering and spreading 50,000 cubic yards of sand on Island. All equipment delivered by barge and loaded on to beach.
Oak Bluffs North Beach Nourishment
Date: 2/1/2020
Value: $950,000
Contact: Oak Bluffs Town Administrator
Engineer: Foth Engineering
Description: Dewatering, trucking, and spreading 40,000 CY of sand on the Island. Build Timber groins with 76 pilings driven 27’ into the ground. Worked through winter conditions on the island with all materials and equipment shipped barged. Reconstruction of existing stone jetty and dredging of harbor entrance.
Value: $950,000
Contact: Oak Bluffs Town Administrator
Engineer: Foth Engineering
Description: Dewatering, trucking, and spreading 40,000 CY of sand on the Island. Build Timber groins with 76 pilings driven 27’ into the ground. Worked through winter conditions on the island with all materials and equipment shipped barged. Reconstruction of existing stone jetty and dredging of harbor entrance.
Town of Bourne Dredging
Date: 12/1/2021
Value: $250,000
Description: Excavate and load 24,000 CY of sand and stockpile on site.
Value: $250,000
Description: Excavate and load 24,000 CY of sand and stockpile on site.
Private Companies
Willowbend Riverside Town Homes
Date: 6/1/2019 – 1/1/2021
Value: $3,200,000
Engineer: Baxter & Nye Engineering
Description: Complete site-packages for (11) new townhomes. Build precast block retaining wall 1,200’ x 30’ high to retain 14,000 CY of compacted fill. Installation of 1,200 LF of 12” ductile iron water pipe, 1,500 LF of 8” sewer main. Prep for site lighting and utilities, grading, curbing, asphalt paving.
Value: $3,200,000
Engineer: Baxter & Nye Engineering
Description: Complete site-packages for (11) new townhomes. Build precast block retaining wall 1,200’ x 30’ high to retain 14,000 CY of compacted fill. Installation of 1,200 LF of 12” ductile iron water pipe, 1,500 LF of 8” sewer main. Prep for site lighting and utilities, grading, curbing, asphalt paving.
Balise Motor Companies Overflow Parking Lot
Date: 7/1/2020
Value: $750,000
Engineer: Baxter & Nye Engineering
Description: Demolition and removal of existing 20,000 SY buildings and parking areas. Installation of site drainage with a retention pond, prep for site lighting and utilities, install curbing and asphalt paving.
Value: $750,000
Engineer: Baxter & Nye Engineering
Description: Demolition and removal of existing 20,000 SY buildings and parking areas. Installation of site drainage with a retention pond, prep for site lighting and utilities, install curbing and asphalt paving.
Polhemus Savery DaSilva
Date: 2012-2017
Value: 2,000,000 – 12,000,000
Description: Provide all site services for the demolition of existing or new construction homes for high-end builders. Site, water, septic, sewer, grading, utility prep, etc.
Value: 2,000,000 – 12,000,000